Vidisha, Madhya Pradesh

Solar panel installation in Vidisha.

Vidisha falls under a different distribution company to our Indore work, so the net-metering file goes to the Central Discom — we handle the application either way rather than handing you a form.

4,410
Units a year, 3 kWp
₹35,280
Saved a year

Book a free site survey

And find out what you could claim — up to ₹78,000 in subsidy.

No obligation. We will not pass your number on.

Local detail

What going solar in Vidisha actually involves.

Book a survey in Vidisha

Your DISCOM

MPMKVVCL (Central Discom)

Net metering is filed with them, and we follow the application through rather than handing you a form.

Generation here

1,470

units per kWp per year, which is what we size your system against — not a national average.

Typical home system

4 kWp

About 320 sq ft of shadow-free roof, around ₹1.42 L after subsidy.

Why us

Solar is a twenty-five year relationship.

Most of what goes wrong with rooftop solar in India goes wrong after the installer has been paid. Here is what we hold ourselves to.

Generation guarantee

The proposal carries an annual generation number, and the O&M contract reports against it every month. Fall short and we make it good.

No middlemen

Survey, design, approvals, subsidy filing and installation are all ours. You deal with one team and one invoice, start to finish.

Built for Indian weather

Galvanised structures engineered to IS 875 wind loading, so the array holds through storm season on a rooftop, not just on paper.

Service that answers

Scheduled cleaning, string-level monitoring and a named engineer for your site. Faults are our problem, not yours.

How it happens

Survey to switched on, in about eight weeks.

  1. Day 1–2

    Site survey

    We measure the roof, check the structure, study shadows across the day and read your last twelve months of bills.

  2. Day 3–5

    Design & proposal

    Layout, string sizing and a single-line diagram, with a firm price and a generation estimate you can hold us to.

  3. Week 2–5

    Approvals & subsidy

    Net-metering application with the DISCOM, CEIG clearance where required, and the PM Surya Ghar subsidy filing. We file, follow up and close it.

  4. Week 5–6

    Installation

    Structure, modules, inverter, cabling and earthing. A typical residential rooftop is finished in three to five days on site.

  5. Week 6–8

    Meter & commissioning

    DISCOM installs the bi-directional meter, we synchronise and test, and you get the baseline generation report.

  6. Ongoing

    Generation & O&M

    Scheduled cleaning, string-level monitoring and a yearly performance report. Faults are our problem, not yours.

Subsidy & net metering

Up to ₹78,000 back from the government.

Under PM Surya Ghar, a residential rooftop system draws a central subsidy paid straight into your bank account. It only releases through a registered installer, and the filing is ours to do.

  1. 01

    Register

    Apply on the National Portal with your DISCOM, consumer number and the sanctioned load.

  2. 02

    Get feasibility approval

    The DISCOM confirms your connection can take the proposed system. Usually a few days.

  3. 03

    Install through a registered vendor

    The subsidy only releases against an empanelled installer. We are registered, so this is already handled.

  4. 04

    Net meter & inspection

    The DISCOM fits a bi-directional meter and inspects the installation.

  5. 05

    Subsidy credited

    Once the commissioning certificate is generated, the amount lands in your bank account, typically within 30 days.

SunPanelsInverterMeterHomeGridsurplus

What net metering actually does

Your meter runs both ways. During the day the array feeds the house first and pushes the surplus onto the grid; at night you draw back from the grid. At the end of the billing cycle you pay only for the net difference, and unused export usually carries forward as credit.

  • Daytime surplus is exported and credited, not wasted
  • Night-time draw comes off those credits first
  • Credits typically carry forward through the settlement year
  • Sanctioned load and roof area cap the system size, not your appetite

Questions

The things everyone asks.

Still unsure about something? Call us and talk to the person who would actually survey your roof.

Talk to an engineer
What does a rooftop solar system cost?

A residential system runs roughly ₹55,000 per kWp installed before subsidy, so a typical 3 kWp home system is around ₹1.65 lakh gross. After the PM Surya Ghar subsidy of up to ₹78,000 the net comes down sharply. The exact figure depends on your roof, the structure needed and the modules chosen — the site survey gives you a firm price.

Can I really go solar with no money down?

In most cases, close to it. The central subsidy covers a large part of the upfront amount, and the balance can be financed so the monthly instalment sits near — often below — what you were already paying the electricity board. You are swapping a bill you will pay forever for an instalment that ends.

How many air conditioners can a 5 kWp system run?

A 5 kWp array generates roughly 600 units a month, which comfortably covers two 1.5-ton inverter ACs used normally alongside the usual household load. What matters more than the panel count is your sanctioned load and how much you run them at night, because night-time use draws from the grid against your net-metering credits.

What happens on cloudy days and at night?

You stay connected to the grid. During the day the array feeds the house first and exports the surplus; at night and in monsoon you draw back against the credits that surplus earned. You are billed only on the net difference, so a cloudy week is smoothed out over the billing cycle rather than leaving you short.

How much roof do I need?

Roughly 80 square feet per kWp on an RCC roof, so a 3 kWp system needs about 240 square feet of genuinely shadow-free area. Ground-mount needs more because rows are spaced apart to avoid shading each other.

How long does the whole process take?

About eight weeks end to end for a typical home. The installation itself is three to five days; most of the calendar goes on DISCOM approvals and the net-metering process, which we file and follow up on your behalf.

What maintenance does it need?

Cleaning, mainly. Dust on the modules is the single biggest cause of lost generation in India. Our O&M contract covers scheduled cleaning, inverter servicing and string-level monitoring, so a dead string is spotted from the dashboard rather than from your bill three months later.

What if I sell the house?

The system stays with the property and transfers to the new owner, along with the remaining module and inverter warranties. A commissioned solar system is generally treated as adding to the property's value.

Nearby

We also work in

Based at 258 Kalani Nagar, Airport Road, Indore 452001.

Start a project

Tell us what you need built.

Send us the site details and the scope. We will come back with a feasibility view and an indicative timeline.

CallWhatsApp